发明名称 STEEL PILE AND CONSTRUCTION METHOD FOR IT
摘要 PROBLEM TO BE SOLVED: To increase the tip bearing force and peripheral surface friction force of a pile by jointly using a steel pipe having a projection, a vibro-hammer, a water jet, and a flowing solidifying material. SOLUTION: This construction method of the steel pile includes: a first process of driving the steel pile with a projection into a load bearing layer by the vibro-hammer while water is injected; a second process of injecting water or a fluid solidifying material and also pulling out the steel pile; and a third process of driving the steel pile again into the load bearing layer while water or the fluid solidifying material is injected, wherein the continuous second process and third process are performed one or a plurality of times. COPYRIGHT: (C)2004,JPO&NCIPI
申请公布号 JP2004270157(A) 申请公布日期 2004.09.30
申请号 JP20030058302 申请日期 2003.03.05
申请人 NIPPON STEEL CORP;TOMEC CORP;CHOWA KOGYO KK 发明人 YAMASHITA HISAO;HIRASHIMA YUTAKA;SAIKAI KENJI;TERADA MASAHIRO;NIWAMOTO KIYOTOSHI;TAKAHASHI KENJI;SUZUKI YUKICHI;YOKOYAMA HIROYASU
分类号 E02D5/32;E02D7/18;E02D7/24;(IPC1-7):E02D7/24 主分类号 E02D5/32
代理机构 代理人
主权项
地址