摘要 |
PROBLEM TO BE SOLVED: To prevent occurrence of damage to plate bodies when the plate bodies with brittleness represented by ALC panels are stacked and transferred. SOLUTION: The hoisting fixture A comprises at least two supporting members 1 that are formed substantially equally to or longer than the cargo width of the plate bodies B, are arranged on the lower surface of the plate bodies B, and support them for hoisting a mountain formed by stacking the plurality of plate bodies B having brittleness. The hoisting fixture A comprises a frame 5 having a locked member 7 to be locked to a hook of a crane and a plurality of engaging sections 8 disposed at predetermined positions that are separated equally to or longer than the cargo width of the plate bodies and along the length direction of the plate bodies, and a plurality of nylon slings 4 for connecting the supporting members 1 to the engaging sections 8 in the frame 5. COPYRIGHT: (C)2004,JPO&NCIPI
|