摘要 |
PROBLEM TO BE SOLVED: To realize eco-friendliness, to eliminate fear of a thread cut, and to provide sufficient strength when constructing a further stable and strong earth structure by increasing shearing strength by three-dimensionally mixing a specific quantity of continuous fiber with sand. SOLUTION: This fiber reinforced earth works method forms reinforced soil by entangling fiber delivered from a fiber supply device with the sand carried from a sand carrying device by using a continuous fiber reinforced soil device having the sand carrying device for carrying the sand, and a continuous fiber supply device for continuously supplying a plurality of fibers. Continuous fiber from the fiber supply device is formed as continuous basalt fiber by melting basalt being a natural mineral. COPYRIGHT: (C)2004,JPO&NCIPI
|