摘要 |
A method for successive concrete of high vertical walls by using a climbing shuttering system having a support structure on which various concrete shuttering elements are loaded hanging downwards. The top supporting carrier and the climbing shuttering system can be supported on completed wall sections. There is at least one lifting device that brings about a relative movement between the too supporting carrier and a lower support carrier of the climbing shuttering system. The shuttering elements can be positioned in a substantially even surface to form a shuttering and at the same time the top supporting carrier can be positioned on the shuttering elements placing them respectively against the walls.
|