PROBLEM TO BE SOLVED: To shorten the construction time required for temporary earth retaining work, shorten the time for recovery work of the temporary earth retaining and to repeatedly use recovered rod materials. SOLUTION: When the rod material 1 of a bearing pile A is driven in a prescribed position, and the side end parts of plywood P, or temporary earth retaining plates, are pushed in clearances between two opposed retaining plates 2 and 2 and between retaining plates 21 and 21 constituting retaining grooves, the retaining plates can erects them by retaining the side end parts of the plywood. This constitution can shorten the working time required for the earth retaining work. The bearing piles A can be recovered and repeatedly used. COPYRIGHT: (C)2004,JPO&NCIPI
|