发明名称 ERECTION METHOD FOR STEEL BEAM OF BRIDGE FRAMEWORK
摘要 FIELD: building technique, particularly for metal bridges construction, namely highway bridge construction. ^ SUBSTANCE: method involves assembling and welding butt of bottom beam boom, adjusting and welding vertical or inclined at 45o angle butts of beam wall insert; welding butts of upper boom insert; welding fillet welds of lower boom, butt and fillet welds of horizontal reinforcing rib inserts; welding orthotrophic plate to upper beam boom; welding together fillet seams of upper boom. Vertical or inclined butts of beam wall inserts of 12-32 mm, preferably 14-20 mm are made by automatic erection welding. During welding at least considerable part of weld seam is forcible formed by hidden arc welding or under melted slag along with feeding one or more welding wires in welding area. Welding wire has solid cross-section with diameter of 1.6 - 3.0 mm. Gap between welding wires is not less than 5 mm. ^ EFFECT: increased reliability of connections formed preferably by vertical welded seams, reduced cost, reduced metal consumption. ^ 5 cl, 3 dwg
申请公布号 RU2230851(C1) 申请公布日期 2004.06.20
申请号 RU20030110101 申请日期 2003.04.10
申请人 发明人 MIRONOV L.M.;GREBENCHUK V.G.;GALKIN S.A.;MATSAJ V.E.
分类号 E01D2/00;E01D21/00 主分类号 E01D2/00
代理机构 代理人
主权项
地址