摘要 |
A transverse rank particularly useful with implement split frame construction includes first and second transversely extending tubular members welded to the fore-and-aft tubes on first and second halves of the frame. The locations of the first and second tubular members on the respective fore-and-aft tubes are staggered. The members are sufficiently long so that they overlap and abut when the frame halves are assembled. The rear face of the forwardmost member abuts the forward face of the rearmost member, and the two tubular members are bolted together at the overlapping portions.
|