摘要 |
<p><P>PROBLEM TO BE SOLVED: To provide a computer system capable of optimizing a transportation plan. <P>SOLUTION: In this system, a factory producing a plurality of kinds of products has production plan data for the product in which unloading destination and carrying-in time limit date are specified per individual product, and a physical distribution foothold for storing the product completed at the factory temporarily prepares a production and transportation plan in the environment for transporting the products for a plurality of ports including a first unloading port and a second unloading port. This system is programmed in such a way that it receives the production plan data for the products, retrieves this plan data using a first key for the first unloading port and a second key for the production schedule date, and realizes a function for allocating the product which conforms to carrying-in time limit date concerning a first ship going toward the first unloading port and has the production schedule date to the first ship. <P>COPYRIGHT: (C)2004,JPO</p> |