摘要 |
PROBLEM TO BE SOLVED: To provide a construction method for a structure capable of increasing the degree of freedom of construction timing, enabling a reasonable/wasteless construction schedule, capable of constructing by normal construction machinery, and capable of increasing productivity, safety, and quality. SOLUTION: This construction method for a structure comprises a step for assembling block modules after temporarily fixing blocks of the structure to the specified support foundations st1a, st1b, st1c, st2a, st2b, and st2c of structures for the blocks k1 and k2 of specified structures, a moving step for moving the assembled block modules to support foundations st11a, st11b, st11c, st12a, st12b, and st12c to which the block modules are fixed, a fixing step for fixing the moved block modules to the support foundations, and an assembling step for assembling the blocks k1 and k2 of the specified structures into the specified block modules on the specified support foundations st1a, st1b, st1c, st2a, st2b, and st2c. COPYRIGHT: (C)2004,JPO
|