发明名称 |
CONSTRUCTION METHOD OF BRIDGE |
摘要 |
PROBLEM TO BE SOLVED: To suppress a social and economical loss to the utmost in building a bridge and reduce the construction cost of a construction itself and the expense of a maintenance work. SOLUTION: A line part 5 to be constructed between two adjacent gate type bridge legs 10 and 10 is formed in a circular shape. An approach part 2 supported by one gate type bridge leg 10 and connected to the line part 5 is formed in a circular shape having the same curvature. The line part 5 is supplied to a part between the gate type bridge legs 10 and 10 by using the approach part 2 as a guide. COPYRIGHT: (C)2004,JPO
|
申请公布号 |
JP2004068552(A) |
申请公布日期 |
2004.03.04 |
申请号 |
JP20020233294 |
申请日期 |
2002.08.09 |
申请人 |
MITSUBISHI HEAVY IND LTD |
发明人 |
ISODA ATSUSHI;TANIGUCHI MASAAKI;OKABE SHUNZO;HASHIMOTO OSAMU |
分类号 |
E01C1/04;E01D2/00;E01D21/00;(IPC1-7):E01C1/04 |
主分类号 |
E01C1/04 |
代理机构 |
|
代理人 |
|
主权项 |
|
地址 |
|