摘要 |
<P>PROBLEM TO BE SOLVED: To provide a support system for delivery schedule preparation, which enables an orderer of a construction company to set a desired date of delivery of a plurality of commodities easily and surely. <P>SOLUTION: An ordering terminal which the orderer uses is provided with an order receiving computer 3 connected via a network. The order receiving computer 3 stores beforehand a relationship between a commodity code 15 and a group code 17 to which the former belongs and arranges the commodity codes 15 of those commodities on the basis of the relationship when the plurality of commodities are ordered by the ordering terminal. Also, the arranged commodity codes 15 are transmitted to the ordering terminal, the desired date of delivery of the commodity is set by the unit of code 17 and the desired date of delivery of the commodity is changed for each commodity. Later, when the desired date of delivery is transmitted from the ordering terminal, a delivery schedule is prepared on the basis of the date. <P>COPYRIGHT: (C)2004,JPO |