摘要 |
A method for well construction and completion is disclosed. Generally the method comprises the steps of 1) drilling through an injection zone, 2) positioning an extendable permeable element on the casing capable of stoppin g formation material from entering the well bore, 3) positioning the casing su ch that the extendable elements are aligned with the injection zone, 4) extendi ng the member such that they come into direct contact with the injection zone formation, 5) running tubing/completion equipment, and 6) begin injecting th e desired fluids into the well. Thus eliminating the need to perforate and gravel pack the well while improving reliability of the injection well completion.
|