摘要 |
The method involves placing all loads (7,8,9,10) in groups with priorities and starting fuel cells immediately after the mains fails and operating them at maximum electrical power. If a maximum energy drain tolerance level is exceeded then groups of loads are switched off, starting with the lowest priority group and increasing the priority until the power drain falls below the tolerance level. |