发明名称 FOUNDATION STRUCTURE PART AND CONSTRUCTION METHOD OF FOUNDATION STRUCTURE PART
摘要 PROBLEM TO BE SOLVED: To shorten the construction period of a foundation structure part of a building or the like and to construct the foundation structure part of precise strength. SOLUTION: This foundation structure part 1 is provided with foundation piles 2, footings 3 provided at the top edges of the foundation piles 2; and footing beams 4 provided between the footings 3. The footing beams 4 are composed of ready-made members formed beforehand in prescribed specification. COPYRIGHT: (C)2004,JPO
申请公布号 JP2003313882(A) 申请公布日期 2003.11.06
申请号 JP20020126565 申请日期 2002.04.26
申请人 ARAI GUMI LTD 发明人 NANBA SHINSUKE;TOMINAGA KOJI
分类号 E02D27/00;E02D27/01;(IPC1-7):E02D27/00 主分类号 E02D27/00
代理机构 代理人
主权项
地址