发明名称 CONSTRUCTION METHOD OF BRIDGE FALLING PREVENTION DEVICE AND TEMPORARY FIXING SHEATH ASSEMBLY
摘要 PROBLEM TO BE SOLVED: To improve the efficiency of the mounting work of a bridge falling prevention device to be provided, for example, on a bridge, in a construction method for mounting the bridge falling prevention device. SOLUTION: The temporary fixing sheath assembly 1 for bridge falling prevention device comprises at least a bearing plate 2 having a cable insert hole extended to both sides thereof, a sheath 3 fixed to one side of the bearing plate, a fixing member fixed to the other side of the bearing plate 2 in conformation to the cable insert hole to fix a cable, and a cap 9 fixed to the other side of the bearing plate so as to cover the fixing member. The construction method of bridge falling prevention device for mounting the bridge falling prevention device comprises installing the temporary fixing sheath assembly into a form by fixing the opening-side end part of the sheath to the form, placing concrete in the form, releasing the form after the concrete is hardened, opening the sheath opening-side end part, inserting the cable from the opening-side end part and fixing it to the fixing member. COPYRIGHT: (C)2004,JPO
申请公布号 JP2003313816(A) 申请公布日期 2003.11.06
申请号 JP20020124513 申请日期 2002.04.25
申请人 SE CORP;CENTRAL CONSULTANT INC 发明人 NINOMIYA TAKASHI;KOBAYASHI OSAMU;MORIYA YOSHIYA;KIBE HIROSHI;FUJITA NORIKAZU
分类号 E01D19/04;E01D2/00;(IPC1-7):E01D19/04 主分类号 E01D19/04
代理机构 代理人
主权项
地址