摘要 |
An arrangement for adaptive time keeping in a utility meter includes a timing circuit and a controller. The timing circuit is operable to generate timing signals. The controller is operably coupled to the timing circuit to receive timing signals therefrom. Further, the controller is operable to: generate a first real-time value based at least in part on an externally generated first reference time value; derive a subsequent second real-time value, based at least in part on the first real-time value, the timing signals, and a timing circuit calibration value; obtain an externally generated second reference time value; determine a rate adjustment based at least in part on a difference between the second real-time value and the second reference time value; and generate a subsequent real-time value based at least in part on the timing signals, the timing circuit calibration value, and the rate adjustment.</PTEXT>
|