发明名称 METHOD OF CONSTRUCTION OF TUNNEL
摘要 PROBLEM TO BE SOLVED: To provide a method of construction of a-tunnel for facilitating mounting of a segment to an erector without damaging a floor surface of the tunnel or blocking up a passage thereof, even if the segment falls from a moving truck or the like, or earth and sand flow into the tunnel. SOLUTION: The tunnel 60 is divided into three stories, and a segment 4 is carried in from a lower space 62 thereof, excavated earth and sand are carried out through an intermediate space 63, and an upper space 64 is used for the passage for workers. COPYRIGHT: (C)2004,JPO
申请公布号 JP2003286799(A) 申请公布日期 2003.10.10
申请号 JP20030125731 申请日期 2003.04.30
申请人 ISHIKAWAJIMA HARIMA HEAVY IND CO LTD;TAISEI CORP 发明人 WAKECHIGAI TAKASHI;TOMIMATSU HIROAKI;MORITA TAIJI;WATANABE OSAMU;MOCHIZUKI OSAMU;INO TOSHIMI
分类号 E21D11/40;(IPC1-7):E21D11/40 主分类号 E21D11/40