发明名称 |
ERECTION METHOD OF MULTI-SPAN CONTINUOUS PREFLEX COMPOSITE BRIDGE OR RE-PRESTRESSED PREFLEX COMPOSITE BRIDGE |
摘要 |
PURPOSE: An erection method of a multi-span continuous preflex composite bridge of a re-prestressed preflex composite bridge is provided to exactly transmit reaction of upper live load to the center of a pier and improve the appearance of the lower part of the bridge. CONSTITUTION: A preflex composite beam(1) or a re-prestressed preflex composite beam formed by composition of a steel I-shaped girder(2) and reinforced concrete(3) or steel strand for prestressed concrete is each manufactured on the ground. Each beam is independently erected on each span of the multi-span bridge as a simple beam structure and mechanism subsystem. The steel I-shaped girder of each span beam is combined completely continuously to change the simple beam structure and mechanism subsystem into a continuous structure and mechanism subsystem. One bridge seat apparatus(6) is installed to each continuous combining portion of each span beam.
|
申请公布号 |
KR20030075455(A) |
申请公布日期 |
2003.09.26 |
申请号 |
KR20020014693 |
申请日期 |
2002.03.19 |
申请人 |
DONG YANG PSC;DONGYANG CONSTRUCTION CO., LTD. |
发明人 |
KIM, WON GEUN;KWON, O GEUN;LEE, MU IL;YOON, SUK HYEON |
分类号 |
E01D2/02;(IPC1-7):E01D2/02 |
主分类号 |
E01D2/02 |
代理机构 |
|
代理人 |
|
主权项 |
|
地址 |
|