摘要 |
PROBLEM TO BE SOLVED: To provide a connector for connecting a tension material in a prestressed concrete structure, capable of improving the work efficiency of inserting the tension material and uniformly pressing a wedge. SOLUTION: In this connector 1, the tension material is fixed by a wedge forced to bite in a conical hole. The connector 1 has a conical hole disposed in the body part for the tension side fixing part of the tension material, a conical hole disposed in a flange part of the body for the fixed side fixing part of the tension material, and a pressing means fitted to the body part to force the wedge 25 mounted in the conical hole of the flange part to bite therein. In the connector 1, the wedge contact surface of the pressing means 3 is formed parallel to the rear end face 25a of the wedge 25 disposed in the conical hole 23b. COPYRIGHT: (C)2003,JPO
|