发明名称 CONSTRUCTION METHOD OF PILE
摘要 PROBLEM TO BE SOLVED: To accurately specify positions of a support layer and a weak intermediate layer when constructing a pile. SOLUTION: This construction method adopts a rotary press-in pile having the constitution for rotatably pressing the whole in the ground by axially connecting a lower pile 6 having the tip deeply embedded in the support layer 3, an intermediate pile 7 arranged in a position of the intermediate layer 4, and an upper pile 8 arranged in an upper part of the intermediate layer. First of all, only the lower pile is rotatably pressed in, and after specifying a position of the intermediate layer, the thickness, and a position of the support layer by determining an N value in the respective depths of the ground 1 from a required torque value at that time, the lower pile is inversely rotated and pulled up, and the length of the lower pile, the intermediate pile, and the upper pile is properly adjusted. The whole is rotatably pressed in the ground by connecting these piles, and a tip part is deeply embedded in the support layer. When rotatably pressing in only the lower pile, the length is preset to the length by adding embedment depth length to a supposed distance up to the intermediate layer from the support layer, and the part is rotatably pressed in by using a spline pile. The intermediate pile is connected by a hinge structure for substantially transmitting no bending moment to the lower pile and the upper pile. COPYRIGHT: (C)2003,JPO
申请公布号 JP2003206533(A) 申请公布日期 2003.07.25
申请号 JP20020006687 申请日期 2002.01.15
申请人 SHIMIZU CORP;SUMITOMO METAL IND LTD 发明人 MURAKAMI KAZUO;AOKI TAKASHI
分类号 E02D5/28;E02D7/20;E02D7/22;E02D13/06;(IPC1-7):E02D7/22 主分类号 E02D5/28
代理机构 代理人
主权项
地址