发明名称 Cascade regulation method for operation of a multi-boiler heating installation, in which after a boiler is switched on or off, further switching on or off of boilers is prevented until a new stable state has been established
摘要 A method in which a first boiler is operated as a lead boiler and further boilers are operated as sequence boilers. A cascade control method is used in which the lead boiler is regulated and sequence boilers are switched on and off according to set values. According to the inventive method if a sequence boiler is switched on or off, switching on or off of further boilers is inhibited for a set time, where the set time corresponds to the transient time of the remaining operating boilers.
申请公布号 DE10145069(A1) 申请公布日期 2003.04.24
申请号 DE20011045069 申请日期 2001.09.13
申请人 VIESSMANN WERKE GMBH & CO. 发明人 BODE, HOLGER;OSTERLOH, REINHARD
分类号 F24D12/02;(IPC1-7):F24H9/20 主分类号 F24D12/02
代理机构 代理人
主权项
地址