摘要 |
PROBLEM TO BE SOLVED: To surely install a door weather strip 1 to a door inner panel 4 by means of a double-sided tape 18. SOLUTION: An upper wall part 15 in a base part 11 is tilted to a bottom wall part 14, and a guide groove 17 guiding a roller pressing jig is constructed of a base part of the hollow part 12 and the base part of a sub-seal lip 13. The double-sided tape 18 is arranged in the bottom face 17a projection position in the orthogonal direction (straight line L direction) to the bottom face 17a in the guide groove 17, and between them, a pillar part 21 is formed along the straight line L. In installation, a load by the roller pressing jig is linearly transmitted to the double-sided tape 18 area via the pillar part 21, and consequently, pressure fitting is carried out surely. The double-sided tape 18 is pressed widely around its central part, and a partial lift by reaction force is not caused. |