摘要 |
PROBLEM TO BE SOLVED: To provide a tool for erecting a pillar and a pillar erecting method using the same, which does not deteriorate the use efficiency of work spaces, improves the safety of erection works, shortens a construction period, and enables delicate adjustment in a easy manner. SOLUTION: A splice plate 6 is arranged across an upper erection piece 5 and a lower erection piece 3, is connected unmovably to the upper erection piece 5. By fixing bolts 10, and connected movably in the vertical direction of the pillar to the lower erection piece 3 within the range of a long hole 9 for a bolt. A first slope part 12 is fixed to the splice plate 6 and a second slope part 14 is fitted on the first slope part 12 in such a way that the sloped surfaces of both slope pars are brought in contact each other. The first slope part 12 is pressed to the lower erection piece 3 by a verticality adjusting bolt 11, and the slope of the upper steel pipe pillar 4 is adjusted. |