摘要 |
PROBLEM TO BE SOLVED: To provide a prediction method of wiring time wherein a required time can be predicted surely when a wire harness is made on a wiring board. SOLUTION: The prediction method of the wiring time is a method to predict the required time when the wire harness 1 is made on the wiring board 3 (wiring time). The wire harness 1 is provided with plural sub-harnesses 2. The sub- harnesses 2 are provided with electric wires 7 and connectors 6. The wiring board 3 is provided with binders 10 to bind the electric wires 7. The prediction method of the wiring time predicts that the wiring time Y of the wire harness 1 as Y=2.52X+6.18M+0.2M<2> X<-1> in the case the total number of sub-harnesses 2 of the wire harness 1 is assumed as X and the total number of connectors 6 of the wire harness 1 is assumed as M. |