摘要 |
The derrick is configured to place the lift axis of the crown block toward the aft end of the rig floor. Major floor loads such as draw works are moved closer to the platform. The spare line spool support is changed from rig floor to platform. The set back areas are distributed on both sides of the vee door.
|