摘要 |
The hydraulic tunnel lining system in underground mining, e.g. coal mining, uses an initial operating hydraulic pressure on the hydraulic ram. When the first pressure level is achieved, a second and higher hydraulic pressure is applied after a time delay. The first pressure is 300 bar, and the second pressure is 400 bar. The two pressure levels are provided from separate sources, with a control block at the tool to change from one stage to the other.
|