发明名称 |
Method for performing dynamic re-scheduling of fabrication plant |
摘要 |
A method/system for performing dynamic re-scheduling of priorities of work-in-process in a fabrication plant for manufacturing of a product is provided. It reads a key stage report for the work-in-process and a master production schedule for the work-in-process from stored data. It generates a master production schedule report from the key stage report and the master production schedule following only Due_Date data for the work-in-process, and generates a work-in-process distribution matrix for integrating the master production schedule report with work-in-process quantity data within a deliverable cycle time; allocates selected lots from the work-in-process distribution matrix using a snake pattern method to allocate the selected lots from the matrix, and changes the due date for the selected lots of the work-in-process selected by the snake pattern method. It generates a final re-scheduling table for the work-in-process including the selected lots.
|
申请公布号 |
US6434443(B1) |
申请公布日期 |
2002.08.13 |
申请号 |
US19990313304 |
申请日期 |
1999.05.17 |
申请人 |
TAIWAN SEMICONDUCTOR MANUFACTURING COMPANY |
发明人 |
LIN KUO-CHEN |
分类号 |
G05B19/418;G06Q10/00;(IPC1-7):G06F19/00 |
主分类号 |
G05B19/418 |
代理机构 |
|
代理人 |
|
主权项 |
|
地址 |
|