发明名称 STEEL-CONCRETE SYNTHETIC FLOOR SLAB AND ITS EXECUTION METHOD AND CONSTITUTIVE MEMBER OF THIS SYNTHETIC FLOOR SLAB AND BRIDGE SUING THIS SYNTHETIC FLOOR SLAB
摘要 PROBLEM TO BE SOLVED: To provide a steel-concrete composite floor slab, its execution method, a constitutive member of the synthetic floor slab, and a bridge using the composite floor slab for securing rigidity when casting concrete in place on a steel plate, and reducing weight of a steel material. SOLUTION: A part of the concrete placed on the steel plate 5 is precedently placed to form a concrete beam 11 having this precedently placed concrete 10, a part of reinforcements 6 and 7, and a part of the steel plate 5, and this concrete beam 11 is provided as a steel plate reinforcing material for holding a dead load before synthesis. Or an installing time reinforcement is arranged in a position lower than a reinforcement (a main reinforcement and a distribution bar) above the steel plate, and a part of the concrete placed on the steel plate is precedently placed up to the vicinity of a position of the installing time reinforcement to form the concrete beam having this precedently placed concrete, the installing time reinforcement, and a part of the steel plate, and having the height lower than the thickness of the composite floor slab after completion.
申请公布号 JP2002180420(A) 申请公布日期 2002.06.26
申请号 JP20010277528 申请日期 2001.09.13
申请人 MITSUBISHI HEAVY IND LTD 发明人 TAMURA KAZUMI;NAKADE OSAMU
分类号 E01D19/12;E04B5/40;(IPC1-7):E01D19/12 主分类号 E01D19/12
代理机构 代理人
主权项
地址
您可能感兴趣的专利