发明名称 |
METHOD OF REINFORCING PERIPHERY OF TIE SHOULDER FOR CONCRETE TIE |
摘要 |
PROBLEM TO BE SOLVED: To solve the problem that cracks are generated in the periphery of a tie shoulder embedded part of a concrete tie by the vibration, etc., due to a train traveling on rails. SOLUTION: A concrete reinforcing material 2 is arranged in the periphery of a lower part of a tie shoulder 1 to be embedded in a concrete tie at a lower part thereof, and this concrete reinforcing material is welded to a lower end 1b of the tie shoulder by spot welding so as to be held. With this structure, special holding of the concrete reinforcing material is unnecessary when placing concrete into a tie mold.
|
申请公布号 |
JP2002121701(A) |
申请公布日期 |
2002.04.26 |
申请号 |
JP20000316258 |
申请日期 |
2000.10.17 |
申请人 |
EAST JAPAN RAILWAY CO;KOWA CONCRETE KK |
发明人 |
ITO KENICHI;HARADA AKIHISA;INOUE HIROMI |
分类号 |
E01B3/28;E01B9/30;(IPC1-7):E01B3/28 |
主分类号 |
E01B3/28 |
代理机构 |
|
代理人 |
|
主权项 |
|
地址 |
|