摘要 |
PROBLEM TO BE SOLVED: To efficiently arrange a vulcanizing station, a mold opening/closing station, a mold replacing station and a rail for a mold transport truck. SOLUTION: In the mold opening/closing apparatus, a tire mold M is opened at a first position (c) receiving a tire mold M from a first mold transport truck 3 and, thereafter, the lower mold part M2 of the tire mold M is laterally moved to a second position (d) and a vulcanized tire is taken out at the second position (d) to perform the supply and shaping of an unvulcanized tire, and this unvulcanized tire is again returned to the first position (c) to close the tire mold M. |