摘要 |
PROBLEM TO BE SOLVED: To overcome the problem of a prior art such that it takes a long time to actually start an operation since this device for performing clustering is provided with an energy saving function for automatically operating transition to a sleep operation when this device is not used in a fixed time, and for reducing the power consumption of this device, and since the energy saving operation is performed for each device. SOLUTION: This information processing system capable of performing a multi-function operation is constituted of a file server which stores a system program operating in a multi-function device, a management server having the date base of the storage position of the file of the system program, and the multi-function device. At the execution of clustering from the multi-function device, transition to a sleep operation is started with the device which is matched with a preliminarily designated condition. |