发明名称 PRODUCTION OPTIMIZATION METHODOLOGY FOR MULTILAYER COMMINGLED RESERVOIRS USING COMMINGLED RESERVOIR PRODUCTION PERFORMANCE DATA AND PRODUCTION LOGGING INFORMATION
摘要 An overall petroleum reservoir production optimization methodology permits the identification and remediation of unstimulated, under-stimulated, or simply poorly performing reservoir completed intervals in a multilayer commingled reservoir that can be recompleted using any of various recompletion methods (including but not limited to hydraulic fracturing, acidization, re-perforation, or drilling of one or more lateral drain holes) to improve the productivity of the well. This provides an excellent reservoir management tool and includes the overall analysis and remediation methodology that has been developed for commingled reservoirs. The specialized recompletion techniques can be used to improve the productivity of previously completed individual reservoir intervals in a commingled reservoir.
申请公布号 WO0229195(A2) 申请公布日期 2002.04.11
申请号 WO2001EP11277 申请日期 2001.09.28
申请人 SOFITECH N.V.;SERVICES PETROLIERS SCHLUMBERGER;SCHLUMBERGER CANADA LIMITED;SCHLUMBERGER TECHNOLOGY B.V.;SCHLUMBERGER HOLDINGS LIMITED 发明人 POE, BOBBY, D.
分类号 E21B47/10;E21B43/00 主分类号 E21B47/10
代理机构 代理人
主权项
地址