摘要 |
The invention concerns a method for successive concreting of high vertical wall by using a climbing shuttering system having a supporting structure on which various concrete shuttering elements are loaded hanging downwards. Said structure is connected at least to a first top supporting carrier that underprops it. The top supporting carrier has the means to support it laterally to a completed wall section. The climbing shuttering system also has at least one lower supporting carrier that can be supported on a completed wall section. There is at least one lifting device that brings about a relative movement between both supporting carriers. According to the invention, the top supporting carrier is designed to be supported on a substantially even surface. Furthermore, the shuttering elements and/or the top supporting carriers are designed in such a way that the shuttering elements can be positioned in a substantially even surface to form a shuttering and at the same time the top supporting carrier can be positioned on the shuttering elements placing them respectively against the walls.
|