发明名称 SHAFT EARTH RETAINING TUNNEL WALL CONSTRUCTION METHOD
摘要 PROBLEM TO BE SOLVED: To provide a shaft earth retaining tunnel wall construction method for eliminating a soil improvement near to an entrance of a shaft by previously forming a tunnel wall inside of the shaft in a starting opening and an arrival opening of a tunnel construction specially for the shaft earth retaining tunnel wall construction method at the starting opening and the arrival opening of the tunnel construction. SOLUTION: A tunnel wall construction frame body is mounted to a liner plate forming the shaft or an entrance inside position of a sheet pile, a space in the tunnel wall construction frame body is filled with a filler, and a hardening tunnel wall is formed in advance on the ground or a construction field to provide the shaft earth retaining tunnel wall construction method for eliminating the soil improvement near to the shaft at the starting opening and the arrival opening of the tunnel construction.
申请公布号 JP2002070476(A) 申请公布日期 2002.03.08
申请号 JP20000301253 申请日期 2000.08.25
申请人 KANAZAWA SEISAKUSHO:KK;CHIYODA BETON KK 发明人 KANAZAWA MITSUO;SHIRATORI KAZUO
分类号 E21D9/06;(IPC1-7):E21D9/06 主分类号 E21D9/06
代理机构 代理人
主权项
地址