摘要 |
PROBLEM TO BE SOLVED: To provide a holding construction which is formed by blow molding as a tubuler body and at the same, time can mount a wire harness on the outer surface of the tubular body. SOLUTION: Haness-fitting members 36, 39 are provided on an installing part 33 for a harness, and the installing part 33 is located on a molding surface 31a of the first mold 31 in a mold 30 for blow molding. The harness fitting members 36, 39 are in projected state and are disposed on the molding surface 31a at required intervals. The harness fitting members 36, 39 are inserted into securing holes 26 which are disposed on a wire harness WH at required intervals. The wire harness WH is held, so as not to move by the installing part 33. By setting a tubular body molded by blow molding in this condition, the wire harness WH is mounted on the outer surface of the tube body after molding, at the same time. |