摘要 |
PROBLEM TO BE SOLVED: To provide a connecting structure of a pile and footing surely installing a stress transmission device in a short period and thereby shortening the construction term. SOLUTION: An end face plate 16 is integrally fixed to the top end of a pile 11, or a PHC pile, a screw rod steel 17 is threadly engaged in a fitting hole 18 provided in the end face plate 16, and the bottom of the stress transmission device 15 is fastened to the screw rod steel 17.
|