Tasks (T) such as repair jobs on a telecommunications system, that are to be performed by field engineers (E) are scheduled by running a scheduler (10) at a server (5) under a predetermined reference set of process conditions to provide schedule data corresponding to schedules of the tasks prepared from task data (4) concerning the tasks to be carried out and resource data (6) concerning characteristics of the engineers available to carry out the tasks over a given period. The resulting schedule data is supplied to the engineers so that they can carry out the scheduled tasks. What-if analyses can be carried out at a workstation controller (7) which acts as a client to the server (5). The process conditions for the scheduler (10) can be selectively modified at the workstation (7) and uploaded to the server which then runs the scheduling process with the modified set of process conditions.
申请公布号
WO0175703(A1)
申请公布日期
2001.10.11
申请号
WO2001GB00919
申请日期
2001.03.02
申请人
BRITISH TELECOMMUNICATIONS PUBLIC LIMITED COMPANY;POTHOS, DIONISIOS;VOUDOURIS, CHRISTOS;LAITHWAITE, ROBERT, NOEL, WILLIAM;ALLETSON, IAN, STUART
发明人
POTHOS, DIONISIOS;VOUDOURIS, CHRISTOS;LAITHWAITE, ROBERT, NOEL, WILLIAM;ALLETSON, IAN, STUART