发明名称 |
EXECUTION STRUCTURE OF STAY HARDWARE FOR LEADER |
摘要 |
PROBLEM TO BE SOLVED: To provide an execution structure of a stay handware for a leader in which a leader can be installed on the surface of an exterior wall member in a short time without a sealing treatment. SOLUTION: A leader 8 is installed on the surface of a new exterior wall member 7 erected in front of an existing exterior wall 10 in this execution structure of a stay metal tool for the leader. One end of a tabular fitting base 2 that a leader holder 3 is provided at the other end of the base is used as a fixing part 21. A fitting plate 61 of an accessory member 6 for connecting exterior wall members arranged between right and left side adjacent exterior wall members or in the joint of a projected corner or a recessed corner is interposed to fix the fixing part 21 to an exterior wall member edge E. The joint is provided so as to be covered with a decoration cover 62 of the accessory member 6.
|
申请公布号 |
JP2001049815(A) |
申请公布日期 |
2001.02.20 |
申请号 |
JP19990245500 |
申请日期 |
1999.08.31 |
申请人 |
MATSUSHITA ELECTRIC WORKS LTD |
发明人 |
IWASHITA DAIJIRO;TANAKA YOSHINORI;FUKUSHIMA TAKAFUMI |
分类号 |
E04D13/08;E04F13/08;(IPC1-7):E04D13/08 |
主分类号 |
E04D13/08 |
代理机构 |
|
代理人 |
|
主权项 |
|
地址 |
|