发明名称 |
TUNNEL WORK EXECUTION METHOD AND WORK EXECUTION DEVICE |
摘要 |
PROBLEM TO BE SOLVED: To provide a tunnel work execution method and work execution device excellent in workability while obtaining positive water stop effect. SOLUTION: This work execution device is provided with an inner form 33 lining the inner surface of an excavated hole T in a position spaced by the specified distance; an end form 34 disposed between the inner form 33 and a skin plate 37 to form a concrete placing space S between the inner form 33 and the natural ground E; a sealant feed pipe 2 for filling sealant B into a construction joint 4 of placed lining concrete K1 following the movement of the skin plate 37 provided movably in an excavating direction while abutting on the inner surface of the excavated hole T; and a concrete feed pipe 36 provided at the end form 34 to feed concrete fed from a concrete supply source D after filling the sealant B, into the concrete placing space S.
|
申请公布号 |
JP2001032693(A) |
申请公布日期 |
2001.02.06 |
申请号 |
JP19990205436 |
申请日期 |
1999.07.19 |
申请人 |
SHIMIZU CORP |
发明人 |
KAWAGUCHI HIROYUKI;ASO TOSHIMITSU;AOYAMA TETSUYA;WATANABE MAHO;NISHIMURA SHINICHI;MIYAZAWA KAZUO |
分类号 |
E21D9/06;E21D11/10;(IPC1-7):E21D11/10 |
主分类号 |
E21D9/06 |
代理机构 |
|
代理人 |
|
主权项 |
|
地址 |
|