发明名称 MOUNTING LOAD INCREASING AND DECREASING METHOD
摘要 PROBLEM TO BE SOLVED: To contrive the increase or decrease of load which settles ground by laying a horizontal drain on weak ground, laying an impervious sheet thereon, mounting a filling material, and controlling an underground water level in the horizontal drain. SOLUTION: A sand mat 2 having the part of a horizontal drain on an existing buried ground 1 is laid into constant thickness, after a recess place 4 surrounded by a temporary weir bank 3 is formed on the sand mat 2, an impervious sheet 5 is laid on the recess place 4 to be made a filling part 6, and dredged clay 7 is mounted in the filling part 6. The permeability of the buried ground 1 and the dredged clay 7 is blocked by the impervious sheet 5, an underground water level in the sand mat 2 is lowered by eliminating water in the sand mat 2, load of loading filling is enlarged by lessening buoyancy acting on the lower face of the impervious sheet 5, the settled amount of the buried ground can be increased. Furthermore, remaining settlement is decreased, and the strength increase of existing ground can be expected.
申请公布号 JP2001011847(A) 申请公布日期 2001.01.16
申请号 JP19990188150 申请日期 1999.07.01
申请人 MITSUI HARBOUR & URBAN CONSTRUCTION CO LTD 发明人 UCHIYAMA KOICHI;FUKUOKA HIDEKI;TAKAHANE YASUHISA
分类号 E02D3/10;(IPC1-7):E02D3/10 主分类号 E02D3/10
代理机构 代理人
主权项
地址
您可能感兴趣的专利