摘要 |
The present invention provides improved methods of cementing casing strin gs in deep water offshore formations penetrated by well bores. The methods are basically comprised of the steps of preparing a cement composition comprised of hydraulic cement, water, gas, a mixture of foaming and foam stabilizing surfactants, a cement early strength accelerator and a mildly set retarding cement dispersi ng agent, placing the cement composition in the annulus between the casing string and the well bore and allowing the cement composition to set into a hard impermeable mass .
|