发明名称 Release of disturbed train station entrances on path with central block
摘要 The method involves testing a continuous use of successive track elements, and releasing a regulation of free track elements, when a corresponding condition is met. A clearance test is triggered, at least at a targeted entry signal (S), the latest at pulling in into the station (Bhf), to produce a clearance message for the continuous use of the first (Bl), and at least two further station sections (B2, B3). The clearance message causes a returned blocking of the path, and the release of the last section of the line (Sn), as well as the utilised entry signal. The clearance message occurs preferably in the target element of the path, to which the release- and utilisation messages of the path- and station sections to be included, are passed.
申请公布号 DE19924967(C1) 申请公布日期 2000.12.21
申请号 DE19991024967 申请日期 1999.05.25
申请人 SIEMENS AG 发明人 BUENGENER, HELMUT
分类号 B61L21/06;(IPC1-7):B61L21/00 主分类号 B61L21/06
代理机构 代理人
主权项
地址