发明名称 |
AN IMPROVED TOP-DOWN METHOD USING THE RETAINING WALL |
摘要 |
PURPOSE: An improved top down method is provided to integrate each stratum slab with a retaining wall, to install a permanent outer wall separated from the retaining wall and to safely construct a underground structure unit of a building with firm structure. CONSTITUTION: An underground structure unit(20) installs a retaining wall(3) by inserting a braced wall(4) between supporting pillars(1) exposed on a ground. The exposed supporting pillars are integrally connected to hold pillars(2) by top down constructing. Then, each stratum slab(21) is installed to a base floor(A) of underground, and a permanent outer wall(22) is mounted to the stratum slab of a top portion from the underground base floor for being separated from the retaining wall. Thereby, the stratum slab is established in a top-down manner to engaged with the retaining wall. Then, the permanent wall is installed from a lower portion of the stratum for being separated from the retaining wall to safely construct the underground structure unit.
|
申请公布号 |
KR100273864(B1) |
申请公布日期 |
2000.12.15 |
申请号 |
KR19980012421 |
申请日期 |
1998.04.08 |
申请人 |
SAMSUNG CORPORATION;SAEGIL ENGINEERING CO., LTD |
发明人 |
LEE, DONG RYUL;SHIN, JEONG GOO;KIM, YONG DAE;CHOI, JUNG BUM;LEE, JUNG JAE;KIM, JONG HO |
分类号 |
E02D29/045;(IPC1-7):E02D29/045 |
主分类号 |
E02D29/045 |
代理机构 |
|
代理人 |
|
主权项 |
|
地址 |
|