摘要 |
<p>PCT No. PCT/IB98/00428 Sec. 371 Date Sep. 27, 1999 Sec. 102(e) Date Sep. 27, 1999 PCT Filed Mar. 23, 1998 PCT Pub. No. WO98/46956 PCT Pub. Date Oct. 22, 1998System to load pre-heated scrap by means of baskets for electric arc furnace, the furnace including a movable roof (28), at least one basket (15) loaded with scrap being arranged in a lateral position near the furnace, the basket (15) being associated with a movable covering system (18), there being included at least a pipe (20) connecting the fourth hole of the furnace with the inside of the basket (15) to convey the fumes leaving the furnace (12) with the function of pre-heating the scrap, the pipe (20) being associated with the covering system (18) and able to be moved therewith, the basket (15) being associated with moving means (16a).</p> |