摘要 |
construction engineering, arrangement of deep cuts especially in limited space of urban building; consolidation of practically vertical lofty banks of loess shores. SUBSTANCE: method includes mounting of relieving walls and their anchoring deep in solid mass. Novelty is that V-shaped panel wall is placed in top part of bank and that made of filtering concrete, in lower part; stiff reinforcing members such as sharing and bending piles are impressed in middle part of bank through height of pre-bored horizontal or inclined holes. EFFECT: reduced labor consumption and improved efficiency of bank consolidation. 1 cl, 2 dwg
|