摘要 |
PROBLEM TO BE SOLVED: To make performable a batch charging operation of coins and taking-in operation supplying coins for actual use actually by a series of continuous operations to improve the operability and improve the workability at the time of assembly and part replacement. SOLUTION: An operation switch AS is integrally provided in an assembly AA in which a coin batch charging part A is provided, and coin batch charging operation and following taking-in operation into the inside are done by a series of continuous operations. Moreover, the coin batch charging part A and the operation switch AS are handled as one assembly AA to improve the workability of assembly and part replacement.
|