摘要 |
PROBLEM TO BE SOLVED: To provide a method capable of efficiently coping with a large-scale work in stone-filling work for a hexagonal net gabion and conveyance. SOLUTION: A protection pipe 6 is erected into an excavated hole to put a bearing pipe 5 thereinto in an insertable manner. When stone-filling work to a gabion body 1 put into the bearing pipe 5 is repeated, the bearing pipe 5 is pulled out from the protection pipe 6 to clean because gravel is accumulated on the bottom of the bearing pipe 5. Then, after the stone-filled gabion is hung up by crane car or the like to pull out, when it is transferred to another conveying vehicle and is conveyed to a place to set, the bearing pipe 5 is pulled out from the protection pipe 6 to convey in a state to remain the gabion incorporated.
|