发明名称 STONE-FILLING WORK FOR HEXAGONAL NET GABION, AND CONVEYING METHOD
摘要 PROBLEM TO BE SOLVED: To provide a method capable of efficiently coping with a large-scale work in stone-filling work for a hexagonal net gabion and conveyance. SOLUTION: A protection pipe 6 is erected into an excavated hole to put a bearing pipe 5 thereinto in an insertable manner. When stone-filling work to a gabion body 1 put into the bearing pipe 5 is repeated, the bearing pipe 5 is pulled out from the protection pipe 6 to clean because gravel is accumulated on the bottom of the bearing pipe 5. Then, after the stone-filled gabion is hung up by crane car or the like to pull out, when it is transferred to another conveying vehicle and is conveyed to a place to set, the bearing pipe 5 is pulled out from the protection pipe 6 to convey in a state to remain the gabion incorporated.
申请公布号 JP2000192437(A) 申请公布日期 2000.07.11
申请号 JP19980378222 申请日期 1998.12.24
申请人 NIPPON GYABION KK 发明人 YASUDA TOMIO
分类号 E02B3/08;E02D3/08;(IPC1-7):E02B3/08 主分类号 E02B3/08
代理机构 代理人