The invention relates to a method for laying electrical cables from a first offshore wind power plant (10) to aecond offshore wind power plant (20). Said method comprises the following steps: placing the cable to be laid (14) in the tower or the foundation component (16) of the first offshore wind power plant (10) before said plant is erected, erection of the first offshore wind power plant (10), taking a tow line (22) from one wind power plant (10, 20) to the other wind power plant (20, 10) and drawing the leading end of the cable (14) from the first wind power plant (10) to the second wind power plant (20) while releasing the cable (14) from the tower or the foundation component (16) of the first wind power plant (10). |