发明名称 CONSTRUCTION METHOD FOR BRIDGE PIER
摘要 PROBLEM TO BE SOLVED: To provide a method for constructing a bridge pier capable of making a drastic saving of bar arrangement work. SOLUTION: A bridge pier is integrally built with a plurality of extension steel pipes through placed concrete by erecting a plurality of steel pipes 6, 7, 9, 10 on a foundation 5 including a plurality of supporting piles piled into the ground and a footing supported by a supporting pile in an arrangement corresponding to the bridge pier to be constructed in a plane shape of the bridge pier to be constructed, placing concrete around the plurality of steel pipes, integrating the plurality of steel pipes with each other through the placed concrete, keeping on adding one or more extension steel pipes 14 to the upper end of the plurality of steel pipes, and placing concrete also on the extension steel pipes thus added. The behavior of the steel pipes being structural members or the bridge pier, conventional troublesome bar arrangement work can be drastically simplified and a construction period can be shortened.
申请公布号 JP2000104225(A) 申请公布日期 2000.04.11
申请号 JP19990316251 申请日期 1999.11.08
申请人 MITSUI CONSTR CO LTD;NKK CORP 发明人 NAKAI SAKAE;KURIHARA YASUO;ATOBE TOSHIRO
分类号 E01D19/02;E01D21/00;(IPC1-7):E01D21/00 主分类号 E01D19/02
代理机构 代理人
主权项
地址
您可能感兴趣的专利