发明名称 EXECUTION METHOD FOR ROOF OF UNDERGROUND TANK
摘要 PROBLEM TO BE SOLVED: To improve an execution property by arranging forms below a truss provided on an opening section at the upper section of an underground tank and placing concrete in the forms to form a roof. SOLUTION: An underground continuous wall is formed in a hole excavated in the ground 1, then a base plate and a side wall are constructed to form an underground section 2A. A tower-like central structure 20 is erected at the center of the base plate, and a dome-like truss 21 is assembled with its center supported by the structure 20. Upper forms 23 and lower forms 24 having a relatively fine width and provided with partition plates on both sides are fitted to the lower section of the truss 21 by separator/form suspending metal fittings 25. Concrete is placed to form an arch-like roof element assembly, and roof element assemblies are likewise formed adjacently in sequence to construct a roof. After the forms 23, 24 and the metal fittings 25 are removed, a work hole is provided at the center of the roof, the structure 20 is removed, the work hole is closed with a cover body after the truss 21 is removed, and a soil cover layer is provided on the roof. The truss 21 can be easily removed, the construction period can be shortened, and the cost can be reduced.
申请公布号 JP2000087494(A) 申请公布日期 2000.03.28
申请号 JP19980257750 申请日期 1998.09.11
申请人 KUMAGAI GUMI CO LTD 发明人 MIMURA TOMOO;KOBAYASHI SATOSHI
分类号 E04B7/10;(IPC1-7):E04B7/10 主分类号 E04B7/10
代理机构 代理人
主权项
地址
您可能感兴趣的专利